THE WORK, EXPLAINED
Start with the condition.
Understand the scope.
Have the affected masonry and proposed replacement area identified before work is agreed. Ask how retained units, replacement materials and joint finishing will be addressed, and what additional findings could alter the scope.
What may be involved
- replacement brick
- mortar
- hand tools
Ask the provider to distinguish existing parts to inspect, proposed replacements, and tools, materials or reports included in the service. Confirm the work and exclusions after assessment; this list does not mean that every item will be supplied or replaced.
LOCAL RESEARCH / Colma
Building history
Colma incorporated in 1924 during the Peninsula's early-twentieth-century suburban expansion.
Source ↗Planning your work
In San Mateo County's incorporated cities the building department for the city that covers the address is the permitting authority, not the county. The Contractors State License Board's consumer page on building permits states the California Building Standards Code position that work may not be erected, altered, repaired or demolished without a permit first obtained from the building official, notes that code requirements vary between cities and counties, and asks readers to check with their local building department. Confirm the scope with that department before work is arranged.
Source ↗Area-wide context does not establish the condition of your property or equipment.
Before the visit
If smoke is entering the room, stop using the fireplace and arrange an assessment.
Service illustration · not a completed customer project

